JNI were approached to become involved in the planning and designing of a improved traffic flow system for a recently built ROM (Run of Mine), with the aim to improve haul driver information of ROM availability and reduce running costs...
Find out moreJNI have a vast range of infrastructure capabilities from supply and installation of mobile skid mounted transformers, installation/relocation of overhead services to protection upgrades of existing High Voltage equipment...
Find out moreWe can assist with selection of the appropriately rated equipment for your installation, offer expert installation and ensure that the your future obligations are met...
Find out moreJNI have a long history of process works, this ranges from flow meters to new water treatment plants. We have recently completed a project that involved two of our disciplines, process and hazardous area works, this project required the installation of six flow meters in highly flammable MIBC lines...
Find out moreOur client required a relocatable power supply, able to withstand the harsh environment of the mining industry, yet at the same time offering maximum asset security and meeting Coal Mining Act requirements with regard to High Voltage approach distances.
Find out moreThe project scope called for the installation of six 30 metre (100ft) lighting towers, to allow for continuous stockpiling on a 24 hour rotation. This project required installation to occur whilst the mine operations continued, JNI and their client had to develop a productive and most importantly safe method of installation. The key to success for this project was to deliver a lighting system that gave ample working light, yet without offering interference to the Haul vehicles drivers vision on approach.
Find out moreWith an increased capacity required for the washplant air system our client required to upgrade to larger Air Compressors. This project required JNI to install parallel cabling to the existing supply cables, this presented a few potential issues, as the plant would remain fully operational during the installation.
Find out moreTo provide installation of Dragline telemetry monitoring system, these works included the installation of multiple cables through Dragline tubs and to mid point on the Dragline booms. The scope also required JNI to install the control panels for the entire system and to assist with the full system commissioning.
Find out more