Jni Subcategory Header

Pegasys

Blackwater Mine 2010-2011

To provide installation of Dragline telemetry monitoring system, these works included the installation of multiple cables through Dragline tubs and to mid point on the Dragline booms. The scope also required JNI to install the control panels for the entire system and to assist with the full system commissioning.

This project allowed JNI to utilise its personnel’s multiple levels of training, requiring Work at Heights, Elevated Work Platform licensing, Confined Space Entry, Hot Works training to name a few.

This project has provided our clients with the most modern up to date technology for the monitoring of these front line machines of the mining industry.

Project Gallery